Integrated production planning

The plan is set.
And it knows what is happening on the floor.

With integrated production planning in EVOMECS, you plan production orders and operations on your machines and workstations. Because planning and the shop floor work on the same data, you can always see how actual production progress compares with the plan. Production planning is available as the optional Planning Module for every edition and plans in several stages – from rough through intermediate to detailed planning.

  • Operation-based planning on machines and workstations
  • Available and planned capacities at a glance
  • Plan and actual progress on one shared data basis
Detailed planning board: planned operations on milling, turning and measuring with the actual progress up to now, one operation running late and the following operation it affects; next to it planned and available capacity per resource
Preliminary illustration

Planning with the data the shop floor already produces.

In many companies, production planning lives in a separate spreadsheet or on a planning board. As soon as an operation takes longer or a machine goes down, the plan is out of date – and nobody notices in time.

EVOMECS plans on the same basis that production uses. Orders, operations and resources come from one data basis, and feedback from the workstation flows back into the planning view. You spot deviations before they affect downstream operations, and you decide how to reschedule.

Which order data is available automatically depends on the ERP connection via suitable, project-specific interfaces.

Example illustration

Today's load

PlannedActual
  • Milling 1
  • Milling 2
  • Turning
  • Measuring

If an operation takes longer, you see the shift and what it means for the following operations. How to reschedule is your decision.

What production planning takes into account.

01

Plan operations on resources

You plan not just the order as a whole but every single operation. Machines and workstations are set up as resources, so it is clear where each step will be produced.

More on order control & worker guidance
Rough planning in the Project Manager: the operations of orders FA-24-10318 to FA-24-10312 as bars across the calendar weeks, below them the resources Milling 01, Turning 01 and EDM 01 with the operations assigned to them
Preliminary illustration

02

Make capacities transparent

Planning shows which capacity on a resource is still available and which is already allocated. Bottlenecks become visible before orders queue up at the machine.

Detailed planning in the Project Manager, Resources only view: for each machine and workstation the time already allocated in calendar weeks 51 and 52, free gaps are available capacity, EDM 01 is double-booked on 21 December
Preliminary illustration

03

Respect dependencies

Milling before EDM, hardening before grinding – production steps build on each other. Planning respects this sequence so that no operation is scheduled ahead of its predecessor.

Hybrid planning in the Project Manager with dependencies switched on: the operations of each order are linked by arrows in their sequence, milling before EDM, hardening before grinding; due date and buffer of each order are shown next to it
Preliminary illustration

04

Align the plan with the shop floor

Processing progress and feedback from production are linked with the plan. Changes and deviations in the workflow become visible in planning and can be taken into account. Where relevant, tool data can also serve as a planning basis.

More on the digital tool process
Hybrid planning in the Project Manager on 18 December 2026 with problem search: completed operations are dimmed, the red now line shows the current state, order FA-24-10322 overruns its due date and is flagged as a problem
Preliminary illustration

Planning with feedback

A plan is only as good as its match with reality.

Integrated production planning is not an isolated planning tool. It is connected with order processing and production data capture. Whatever is reported at the workstation is available in planning – without transferring data and without maintaining it twice.

Detailed planning in the Project Manager: orders with their operations, due date and buffer at the top, the allocation of the resources Milling 01 to measuring room on the same time axis below, with the now line on 18 December 2026
Preliminary illustration
  • One data basis for planning and production instead of parallel spreadsheets.
  • Operations clearly assigned to machines and workstations.
  • Allocated and free capacity at a glance.
  • Sequences between production steps are taken into account.
  • Spot deviations between plan and actual status early.
  • Reschedule based on current feedback from production.

Frequently asked questions about integrated production planning.

Benjamin Neubauer

Benjamin Neubauer

Chief Executive Officer (CEO), EVOMECS

How to get started

Your demo – tailored to your production.

In the first meeting we show you EVOMECS in a live demo tailored to your company. Afterwards you can try EVOMECS free of charge for two weeks in your own demo system.

  1. 1First meeting · 30 minutes onlineWe introduce EVOMECS, show it in a short live demo and clarify your needs.
  2. 2Your demo systemIf you wish, we set up your own demo system in Shopfloor Light – with your machines and sample data. You receive the invitation by email.
  3. 3Try it yourself for two weeksYou and your colleagues try out how orders, feedback, machine status and downtimes work together. Free of charge, without installation and without connecting machines.
  4. 4Connect your machinesIn Shopfloor Light you connect your machines yourself using our guide. If you wish, we support you in a pilot project.
How to get to know EVOMECS
Book a demo

First meeting: 30 minutes · online · free of charge