Chapter 2 · Introduction
Preparing the introduction
What is clarified before the start, who is involved and what your IT sets up itself. Written for everyone planning and coordinating an introduction of EVOMECS internally.
At a glance
- The machine list is reviewed together, online if you like.
- For each machine, we record which interface is used and which data can be captured.
- Open points about control options and the network are clarified together before they go into the plan.
- Your IT installs the hub and sets up access itself, without EVOMECS being involved.
- The introduction checklist brings all preparation points together.
How the preparation works
The preparation gives you a clear statement for each machine instead of a blanket promise. It is the basis for the start and the rollout.
- 1Compile the machine listYou list your machines with manufacturer, type, year of manufacture, control, software version and IP address. The introduction checklist shows which details are useful for each control.
- 2Review the machine list togetherIn a joint meeting, online if you like, you go through the list with EVOMECS. For each machine we record which interface is used, which prerequisites such as a licence, an update or network access are needed, which additional hardware is required and which data points can be captured.
- 3Clarify open pointsWhere control options or network connections are not known for certain, you clarify them with your machine manufacturer or your IT. This way the plan is based on the actual state of your machines.
- 4IT setup by your ITYour IT sets up the server for the EVOMECS Hub, the firewall rule and the access accounts itself. The key parameters for this are defined together in the introduction project.
What is defined in the introduction project
Your IT installs the hub and sets up access without EVOMECS being involved. These key parameters are defined together for this.
| Item | What it is about |
|---|---|
| Address of the cloud customer system | The address to which your firewall allows the outbound connection on TCP 443 |
| Internal hostname of the hub | The name under which workstations and terminals reach the EVOMECS Hub in the company network |
| Number of hubs | One hub or several, for example one per site or hall |
| Sign-in method | Local password, Microsoft Entra ID, Google Workspace, EVOMECS account or RFID card |
| Machines and ports | The list of machines and the ports the hub uses to reach the controls in the local network |
| Remote maintenance rules | Which remote maintenance channels are enabled when needed |
| Data backup | Scope and retention of the data backup |
Who prepares what?
| Area | Involved | Tasks |
|---|---|---|
| Machines | Maintenance, production management | Machine list, controls and options, control systems and cell controllers, desired data scope per machine |
| Tool process and systems | Production planning, tool management | CAM systems, tool databases, presetters and storage systems |
| IT | Your IT | Hub server, hostname and certificate, firewall, sign-in method, remote maintenance rules |
| End devices | IT, production management | Workstations, terminals and tablets according to the system requirements, including scanners and card readers |
Frequently asked questions about the preparation
Does someone from EVOMECS have to be on site to review the machine list?
No. The review can take place online. On-site visits are not part of the preparation; if you would like one, we arrange it separately.
What information do we need about our machines?
Manufacturer, type, year of manufacture, control, software version and IP address. Details on the Ethernet port and control options as well as on existing control systems or cell controllers are also useful. The introduction checklist lists all points.
Does EVOMECS set up the hub in our network?
No. Your IT installs the hub and sets up access itself, without EVOMECS being involved. Key parameters such as the hostname, the number of hubs and the sign-in method are defined together in the introduction project.
When should we involve the works council?
We recommend involving it early if a works agreement governs the capture of machine data. The per-machine list of capturable data points is a transparent basis for this.
Read on
Open technical questions are best clarified directly – with your machine list and your IT at the table.
Arrange a technical call
Benjamin Neubauer
Chief Executive Officer (CEO), EVOMECS
How to get started
Your demo – tailored to your production.
In the first meeting we show you EVOMECS in a live demo tailored to your company. Afterwards you can try EVOMECS free of charge for two weeks in your own demo system.
- 1First meeting · 30 minutes onlineWe introduce EVOMECS, show it in a short live demo and clarify your needs.
- 2Your demo systemIf you wish, we set up your own demo system in Shopfloor Light – with your machines and sample data. You receive the invitation by email.
- 3Try it yourself for two weeksYou and your colleagues try out how orders, feedback, machine status and downtimes work together. Free of charge, without installation and without connecting machines.
- 4Connect your machinesIn Shopfloor Light you connect your machines yourself using our guide. If you wish, we support you in a pilot project.
First meeting: 30 minutes · online · free of charge