Tool Process & NC Data

How NC programs and tool data get from CAM into EVOMECS, how tools, presetting and storage work together, and how NC programs are released and versioned per machine.

ForProduction planningCAM programmingTool managementQuality assurance

At a glance

  • CAM-neutral – even several CAM systems in parallel for the same machine.
  • NC programs and tool data are taken over from CAM, via database access or plugin depending on the system.
  • Tools that appear in several CAM systems are managed as one tool, without duplicates.
  • Tool demand is determined automatically from the NC programs.
  • Tool presetters in both directions – measured values come back without manual entry.
  • Release per machine, with a record of who released what and when.
  • Every revision is kept as a version, and optimizations made at the machine are brought back.

CAM systems and tool data

  • CAM-neutral – an NC program is assigned to the operation and the machine, regardless of which CAM system it comes from.
  • Running several CAM systems in parallel, even for the same machine, is not a special case – for example during a CAM changeover.
  • NC programs and tool data are taken over from the CAM system, via database access or plugin depending on the system. Common CAM systems are already connected in production.
  • Tools that appear in several CAM systems are managed in EVOMECS as one tool.
  • Tool demand is determined automatically from the NC programs and can be prepared for each order.

Tool management as the leading system

  • EVOMECS manages tools, tool assemblies and tool instances with tool life, storage location and machine – down to tracking individual cutting edges.
  • Existing tool databases are migrated once. Running both in parallel is intended only for the transition period.
  • Tools are uniquely identified by QR code, Data Matrix code or RFID.
  • Tool storage cabinets and dispensing systems can be connected via the optional StockBridge interface to manage and trace tool movements. Tools can be assigned to freely definable storage locations.

Tool presetters in both directions

Target data goes to the presetter, and measured values come back to EVOMECS without manual entry – and from there to the machine.

  1. 1Target data to the presetterEVOMECS passes the tool's target data to the presetter – directly via its interface or as a measuring job in an XML file.
  2. 2Measuring at the presetterThe presetter takes over the measuring job and the tool is measured.
  3. 3Measured values back to EVOMECSThe measured values come back without manual entry and are assigned to the tool.
  4. 4On to the machineFrom EVOMECS the values go to the machine – depending on the machine directly into the control, via a control system or cell control, or by hand scanner.

Two ways to connect tool presetters

Direct

Connection via the presetter's own interface.

File-based via XML

Through the EVOMECS Hub, EVOMECS places a measuring job as an XML file in an agreed folder. The presetter imports it automatically, measures and saves the results as an XML file in turn. The Hub transfers the measured values to EVOMECS. In this setup the Hub runs on the presetter's computer and communicates via port 443.

NC program management

These functions are part of the standard NC program management and are particularly relevant for quality assurance and IT.

  • Release per machine – the releasing user confirms with their login, and EVOMECS records who released what and when.
  • A released revision is locked. Uploading, editing or deleting is only possible after a new release.
  • Every revision is kept as a version, and older versions are read-only.
  • Optimizations the operator makes at the machine are brought back, compared with the original revision and saved as a new revision.
  • Role-based permissions, separated by function – for example viewing, changing, uploading, deleting and releasing NC programs. We define the roles together during the rollout.

Program status

The status shows at any time whether an NC program may go to the machine.

StatusMeaning
ReleasedThe revision is released for the machine and locked against changes.
LockedThe revision must not be used.
Simulation pending, running or failedState of the program's simulation, for example with the optional NCGuard interface.
Locked due to tool damageThe program is locked because of tool damage.

The list shows the most important statuses; it is not exhaustive.

Frequently asked questions about tool process and NC data

Can we use several CAM systems in parallel?

Yes. EVOMECS is CAM-neutral. An NC program is assigned to the operation and the machine regardless of the CAM system. Running several CAM systems in parallel, even for the same machine, is not a special case – for example during a CAM changeover.

How do NC programs and tool data get from CAM into EVOMECS?

They are taken over from the CAM system, via database access or plugin depending on the system. Common CAM systems are already connected in production. We define the path for your system in the project. From Shopfloor Essentials, this is handled by the ToolSync In and ToolSync Out interfaces for tool data in both directions and NCSync In for NC programs.

What happens to our existing tool database?

The existing data is migrated to EVOMECS once. After that, EVOMECS is the leading system. Running both in parallel is intended only for the transition period.

How are tool presetters connected?

Directly via the presetter's interface, or file-based via XML with the EVOMECS Hub running on the presetter's computer. In both cases the measured values come back without manual entry – via the PresetBridge interface, which is included as standard from Shopfloor Essentials. Which software modules the presetter needs depends on the manufacturer.

Can a released NC program still be changed?

No. A released revision is locked. Uploading, editing or deleting is only possible after a new release, and EVOMECS records who released what and when.

What happens to optimizations the operator makes at the machine?

They are brought back, compared with the original revision and saved as a new revision. Older versions are kept and are read-only.

Open technical questions are best clarified directly – with your machine list and your IT at the table.

Arrange a technical call
Benjamin Neubauer

Benjamin Neubauer

Chief Executive Officer (CEO), EVOMECS

How to get started

Your demo – tailored to your production.

In the first meeting we show you EVOMECS in a live demo tailored to your company. Afterwards you can try EVOMECS free of charge for two weeks in your own demo system.

  1. 1First meeting · 30 minutes onlineWe introduce EVOMECS, show it in a short live demo and clarify your needs.
  2. 2Your demo systemIf you wish, we set up your own demo system in Shopfloor Light – with your machines and sample data. You receive the invitation by email.
  3. 3Try it yourself for two weeksYou and your colleagues try out how orders, feedback, machine status and downtimes work together. Free of charge, without installation and without connecting machines.
  4. 4Connect your machinesIn Shopfloor Light you connect your machines yourself using our guide. If you wish, we support you in a pilot project.
How to get to know EVOMECS
Book a demo

First meeting: 30 minutes · online · free of charge